WhatsApp: +86 153 3380 7511 [email protected]

Energy-Saving Grinding

Vertical Raw Mill

A vertical roller mill (VRM) that combines grinding, drying, and classification in a single compact unit — saving 20-30% energy versus ball mills. Capacities from 70 to 720 t/h, with integrated hot-gas drying for feed moisture up to 20%. The modern choice for dry-process cement plants.

43.8-485 tMill Weight
70-720 t/hCapacity
20-30%Energy Saving
3-in-1Grind/Dry/Classify

Product Overview

About the Vertical Raw Mill

The vertical raw mill — also known as a vertical roller mill (VRM) — is an advanced grinding machine that reduces cement raw materials (limestone, clay, marl, sand, iron ore) into fine raw meal using compression and shear between rotating grinding rollers and a stationary grinding table. Unlike a ball mill, which grinds by impact of tumbling media, the VRM grinds by bed compression — a fundamentally more efficient mechanism that consumes 20-30% less electrical energy per ton.

A key advantage of the VRM is its 3-in-1 functionality: grinding, drying, and classification occur simultaneously in a single machine. Hot gases from the preheater exhaust or a hot-air furnace (250-400°C) pass through the mill, drying feed with up to 20% moisture while grinding. An integrated dynamic separator (classifier) at the top of the mill continuously separates fine product from coarse particles, returning the coarse fraction for regrinding. This eliminates the need for separate drying equipment, external separators, and conveying systems — reducing building volume, civil works, and auxiliary equipment.

LIMING vertical raw mills are the preferred choice for new dry-process cement plants with capacities from 1,000 to 10,000 TPD. Their small footprint, low noise, and superior energy efficiency deliver rapid return on investment, while their ability to handle wet, sticky feed makes them versatile across diverse raw material conditions.

Key Benefits

Advantages of LIMING Vertical Raw Mill

Superior energy efficiency and compact design for modern dry-process cement plants.

20-30% Energy Saving

Bed-compression grinding uses 20-30% less power per ton than ball mills. For a 5,000 TPD plant, this saves millions of kWh annually — paying back the higher capital cost in 2-3 years.

📐

Small Footprint

Compact vertical design occupies 50-70% less floor area than a ball-mill circuit. Lower building height and civil-works cost — ideal for greenfield and retrofit projects with limited space.

🔥

Integrated Drying

Hot preheater exhaust gas (250-400°C) dries feed moisture up to 20% while grinding — eliminating the need for a separate dryer and crusher-dryer. Reduces equipment count and energy use.

🎛

Built-in Dynamic Separator

Integrated high-efficiency classifier ensures precise product fineness (80-90% passing 90μm) with narrow particle-size distribution. Adjustable rotor speed for instant fineness control.

Vertical Raw Mill Specifications

Representative VRM models for cement raw material grinding.

Model Table Ø (mm) Capacity (t/h) Feed Size (mm) Product Fineness (R90μm) Motor Power (kW) Weight (t)
TRM-17.41,74070-90≤50≤12%80043.8
TRM-22.02,200100-130≤50≤12%1,00068.0
TRM-25.02,500140-180≤60≤12%1,25095.0
TRM-28.02,800180-240≤60≤12%1,800130.0
TRM-32.03,200240-310≤70≤12%2,400175.0
TRM-34.03,400300-380≤70≤12%2,800205.0
TRM-36.43,640350-440≤80≤12%3,200245.0
TRM-38.43,840400-500≤80≤12%3,800285.0
TRM-41.44,140480-580≤80≤12%4,200340.0
TRM-43.44,340550-650≤90≤12%4,800395.0
TRM-45.44,540620-720≤90≤12%5,400485.0

* Specifications are for reference only. Actual capacity depends on material hardness, feed moisture, and fineness requirement. Contact LIMING for custom sizing.

How It Works

Working Principle of Vertical Raw Mill

The vertical raw mill grinds material by bed compression between rotating rollers and a stationary grinding table. Hot gas simultaneously dries the feed, and an integrated dynamic separator classifies the product — all in one machine.

  1. Material feed: Crushed raw material is fed onto the center of the rotating grinding table via a rotary feeder or chute. Hot gases (250-400°C) from the preheater are introduced through the nozzle ring at the table perimeter.
  2. Centrifugal spreading: As the table rotates, centrifugal force moves the material outward toward the grinding track, where it forms a stable material bed between the table and the hydraulically-pressed rollers.
  3. Bed compression grinding: The rollers press down on the material bed (not on the table directly), compressing and shearing the particles. This bed-compression mechanism is far more energy-efficient than the impact grinding of a ball mill.
  4. Drying: The hot gas stream passing upward through the nozzle ring evaporates moisture from the material (up to 20%) while entraining fine particles toward the classifier. Drying and grinding occur simultaneously.
  5. Classification: The dynamic separator (rotating cage) at the top of the mill classifies the entrained particles. Fine particles that pass through the cage are conveyed out as finished raw meal; coarse particles fall back to the table for regrinding.
  6. Product discharge: The finished raw meal exits the mill with the gas stream, is captured in a cyclone or bag filter, and is conveyed to the raw meal homogenization silo. Oversize material that falls through the nozzle ring is removed by a vibrating tray for regrinding or rejection.

Vertical Raw Mill FAQ

How much energy does a vertical raw mill save compared to a ball mill?
A vertical roller mill typically saves 20-30% electrical energy per ton of raw meal compared to a ball mill, because it uses compression and shear between rollers and the table rather than impact. For a 5,000 TPD cement plant, this can save millions of kWh per year, paying back the higher capital cost within 2-3 years.
Can a vertical raw mill handle wet feed?
Yes. The vertical raw mill integrates a drying function using hot gases (250-400°C) from the preheater exhaust or a hot-air furnace. Feed moisture up to 15-20% can be dried and ground simultaneously, eliminating the need for a separate dryer — a major advantage over ball mills.
What are the main wear parts of a vertical raw mill?
The main wear parts are the grinding rollers (tires), grinding table liner, and classifier blades. These are made of wear-resistant alloys and are replaceable. Typical service life is 8,000-15,000 hours depending on material abrasiveness. LIMING supplies genuine replacement wear parts for fast turnaround — see our spare parts page.
Is a vertical raw mill suitable for small cement plants?
Vertical raw mills are most economical for medium to large plants (above ~1,000 TPD) where the energy savings justify the higher capital cost. For very small mini-plants, a ball mill may be more cost-effective due to lower initial investment. LIMING offers both; we recommend based on your specific scale and ROI targets.

Need a Vertical Raw Mill for Your Plant?

Tell us your clinker capacity, feed moisture, and energy targets. Our engineers will size the optimal VRM and send a quotation within 24 hours.

WhatsApp: +86 153 3380 7511 [email protected]
WhatsApp: +86 153 3380 7511 [email protected]