WhatsApp: +86 153 3380 7511 [email protected]

At a Glance

Project Overview

A comprehensive summary of this landmark EPC cement production line project delivered for a major building materials group in Liaoning Province.

Client

Leading Cement Group

Location

Liaoning, China

Capacity

8,000 TPD

Process

Dry Process

Project Type

Full EPC

Completion

2022

Automation

DCS Control

Status

In Operation

Project Details

From initial engineering design through commissioning, this project demonstrated LIMING Machinery's full-spectrum EPC delivery capability.

Project Background

In response to growing infrastructure demand across Northeast China, a prominent cement group commissioned LIMING Machinery to design, supply, and construct a world-class 8,000 TPD cement clinker production line in Liaoning Province. The project was delivered on a full EPC (Engineering, Procurement, and Construction) basis, covering everything from geological surveys and civil engineering to equipment manufacturing, installation, commissioning, and operator training.

The production line was designed to utilize advanced dry-process technology with a single production string, maximizing economies of scale while maintaining stringent environmental compliance standards. The project was completed on schedule and within budget, with all performance guarantees met or exceeded during the commissioning phase.

Process Design & Engineering

The line employs a state-of-the-art dry-process configuration with a five-stage cyclone preheater and precalciner system feeding into a large-capacity Φ5.0×74m rotary kiln. Raw material preparation is handled by a vertical roller mill (VRM), delivering consistent and high-quality raw meal for the kiln feed system. Clinker cooling is achieved through an advanced grate cooler with optimized heat recovery, maximizing thermal efficiency throughout the process.

The entire production line is governed by a fully integrated Distributed Control System (DCS), enabling centralized monitoring and precise control of every production parameter. Real-time data acquisition, process optimization algorithms, and automated alarm management ensure stable operation at rated capacity with minimal operator intervention.

Results & Performance

Since commissioning, the 8,000 TPD line has consistently achieved its rated clinker production capacity with excellent quality metrics. Specific heat consumption and power consumption are well below industry benchmarks, and the line's environmental emissions fully comply with the latest Chinese national standards. The DCS automation system has significantly reduced the plant's operational labor requirements while improving process stability and product consistency.

Key Machinery

Equipment Supplied

LIMING Machinery manufactured and supplied the core process equipment for this production line.

Project Highlights

What set this project apart and the key advantages delivered to the client.

Large Single-Line Capacity

At 8,000 TPD clinker capacity from a single production string, this line achieves exceptional economies of scale unmatched by multi-kiln configurations of equivalent total output.

Energy-Efficient Operation

Optimized preheater design, high-efficiency grate cooler with maximum heat recovery, and VRM raw grinding combine to deliver industry-leading specific heat and power consumption figures.

Fully Automated DCS Control

A comprehensive Distributed Control System monitors and controls the entire production process from the central control room, minimizing labor requirements and maximizing process stability.

Full EPC Delivery

LIMING Machinery managed the complete project lifecycle — from engineering design and equipment manufacturing through construction, installation, commissioning, and training — delivering a true turnkey solution.

Environmental Compliance

Advanced baghouse technology ensures particulate emissions far below the most stringent regulatory requirements, while low-NOx calciner design minimizes NOx generation at source.

On-Time Completion

Despite the project's scale and complexity, the line was commissioned on schedule, enabling the client to capitalize on strong regional cement demand without delay.

More Case Studies

Related Projects

Explore more cement production line projects delivered by LIMING Machinery worldwide.

View All Case Studies →

Start Your Cement Plant Project Today

Contact our engineering team to discuss your cement production line requirements. We provide tailored EPC solutions from concept to commissioning.

WhatsApp: +86 153 3380 7511 [email protected]
WhatsApp: +86 153 3380 7511 [email protected]